Send Message

Sliding Door Prefabricated Steel Two Car Garage Metal Building

100 square meters
MOQ
$60.00/square meters 100-9999 square meters
Price
Sliding Door Prefabricated Steel Two Car Garage Metal Building
Features Gallery Product Description Request A Quote
Features
Specifications
Standard: AiSi
Grade: Steel
Type: Heavy
Application: Steel Structure Garage
Tolerance: ±1%
Processing Service: Bending, Welding
Delivery Time: 8-14 Days
Main Frame: Solid H-shape Steel Beam
Purlin: C.Z Shape Steel Channel
Material: Q235B/Q345B Low Carbon Steel
Window: Aluminum Alloy Window
Roofing: Sandwich Panel. Single Steel Sheet
Door: Sliding Door
Wall&Roof Panel: Insulation Sandwich Panel
Main Structure: Customzation Size
Certificate: CE/ ISO9001
Use: Car Garage
High Light:

Prefabricated Steel two car metal garage

,

Sliding Door two car metal garage

,

Prefabricated Steel two car garage metal building

Basic Infomation
Place of Origin: Shandong, China
Brand Name: JUHE
Model Number: Q235B/Q345B Low Carbon Stee
Payment & Shipping Terms
Product Description
 
Sliding Door Portable Garage For Two Car Parking Prefabricated Steel Garage Buildings
Products Description
Portable Garage For Two Car Parking Prefabricated Steel Garage Buildings High Quality Portable Light For Car
Sliding Door Prefabricated Steel Two Car Garage Metal Building 0
Steel structure garage has features of high fire resistance, strong corrosion resistance. steel structure garage is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.Each component using welds, bolts or rivets to connect. The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall. The usage scale includes large-scale workshop, or warehouse, supermarkets,hangar, entertainment centers and modular steel structure garage.
Specification
 
 
Items
 
Specification
Main Steel Frame
Column
Q235, Q355 Welded H Section Steel
 
Beam
Q235, Q355 Welded H Section Steel
Secondary Frame
Purlin
Q235 C and Z purlin
 
Knee brace
Q235 Angle Steel
 
Tie Rod
Q235 Circular Steel Pipe
 
Brace
Q235 Round Bar
 
Vertical and Horizontal Support
Q235 Angle Steel, Round Bar or Steel Pipe
Maintenance system
Roof Panel
EPS Sandwich Panel / Glass Fiber Sandwich Panel /
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet
 
Wall Panel
Sandwich Panel / Corrugated Steel Sheet
Accessories
Window
Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window
 
Door
Sliding Sandwich Panel Door / Rolling Metal Door 
 
Rainspout
PVC
Live load on Roof
 
In 120kg/Sqm (Color steel panel surrounded)
Wind Resistance Grade
 
12 Grades
Earthquake-resistance
 
8 Grades
Structure Usage
 
Up to 50 years
Finishing Options
 
Vast array of colors and textures available
Paint Options
 
Alkyd paiting, two primary painting, two finish painting
(Primer ,Medium paint ,top coat, epoxy zinc etc.) Or Galvanized.
Characteristics 1. Different types and sizes according to customer's needs, large or small, wide span: single span or multiple spans, the max span is 36m without middle column. 2. Low cost and maintenance: unit price range from USD30/m2 to USD70/m2 according to customers request. 3.Fast construction and easy installation: time saving and labor saving, all the items are factory- made,pre-cut,pre-welded, pre-drilled,pre-painted. 4.Reduced construction waste, long using lifespan: up to 50 years. 5. Nice appearance. 6. Others: environmental protection, stable structure, High quake-proof, water proof and fire proof, and energy conserving.
Details Images
Sliding Door Prefabricated Steel Two Car Garage Metal Building 1

Steel Structure Hangar

Pre-engineered Steel structure garage is one of the innovative technologies in building construction solutions. Its economical price, convenient transportation and quick installation make it more and more popular in construction area.
Sliding Door Prefabricated Steel Two Car Garage Metal Building 2
Steel structure garage
 
 
- Custom size and color- Light weight, high strength
- Easy assemble, short construction period
- Reusable, easy move, low cost
Steel structure garage
 
 
 
- Custom size and color- Light weight, high strength, large span
- Easy build, easy move, easy maintenance
- Wildly use, can be used as a warehouse, workshop, factory, hangar, office building, etc.
Sliding Door Prefabricated Steel Two Car Garage Metal Building 3
Sliding Door Prefabricated Steel Two Car Garage Metal Building 4
Sliding Door Prefabricated Steel Two Car Garage Metal Building 5
Sliding Door Prefabricated Steel Two Car Garage Metal Building 6
Sliding Door Prefabricated Steel Two Car Garage Metal Building 7
Sliding Door Prefabricated Steel Two Car Garage Metal Building 8
Sliding Door Prefabricated Steel Two Car Garage Metal Building 9
Sliding Door Prefabricated Steel Two Car Garage Metal Building 10
1. Primary Framing
Main steel frame is mainly composed of steel beams, steel columns, steel trusses and other components made of section steel and steel plate, and adopts rust removal and anti-rust process such as shot blasting, painting and galvanizing. Welding, bolts or rivets are usually used to connect each member or component. JUHEs pre-engineered steel structure building is custom-designed to meet your exact requirements. The most common primary framing systems are shown below. Practically any frame geometry is possible. Consult JUHE for your specific requirements.
Sliding Door Prefabricated Steel Two Car Garage Metal Building 11
2. Secondary Framing (Bracing, Z and C section purlin)
Purlin, tie bar and bracing are secondary structural members used to support the wall and roof cladding. Secondary members as purlin, tie bar, column bracing and horizontal bracing connect the main frame and help in resisting part of the longitudinal loads that are applied on the building such as wind and earthquake loads. Steel purlin is available in high grade steel conforming to GB/T 2518-2008, Q235B/Q345B Grade or equivalent, available in 1.8 mm. 2.0 mm, 2.2 mm, 2.5 mm and 3.0 mm thickness. The purlin come with a galvanized sheet. Column bracing is a connecting member set between two adjacent columns to ensure the overall stability of the building structure, improve lateral stiffness and transfer longitudinal horizontal force. Column bracing will be round steel or angle steel according to the building need.

 

 
Sliding Door Prefabricated Steel Two Car Garage Metal Building 12
3.Roof and wall cladding system
JUHE offers a complete line of Roof and wall steel sheet, sandwich panel, and their related accessories, steel cover, trims, eave gutter, curved eave cover, wall flashing for a wide range of building applications.Variety of profiles, base metal, metal substrates and coatings for its sheet. The metal sheet are used as roof and wall panels, interior roof and partition panel, etc. Steel sheet, its base sheet is usually be galvanized sheet or aluminium zinc sheet with organic coating. It has the advantages of good corrosion resistance, bright color, beautiful appearance, convenient processing and forming, and has the original strength of the steel plate and low cost. The thickness of steel sheet usually be 0.3mm-0.7mm and used in different building and requirement. Sandwich panel is composite insulation panel made by two sides steel sheet and heat insulated core material through binder (or foam). The core can be EPS (polystyrene ), fiberglass wool, rock glass wool and PU (polyurethane), thickness 50mm, 60mm, 75mm, 100mm, 150mm, 200mm, etc.
Sliding Door Prefabricated Steel Two Car Garage Metal Building 13
4. Steel Decking Floor
The pressed steel plates supporting the floor concrete are called profiled plates, also called floor bearing board. The steel decking board are widely used in multi-storey buildings such as power plant, exhibition hall, steel structure workshop, cement warehouse, steel structure office, airport terminal, railway station, stadium, concert hall, grand theater, large supermarket, logistics center, Olympic venues and sports venues and other steel structure buildings. It can adapt to the main steel structure rapid construction requirements, can provide a firm platform in a short time, and can take flow repetitive construction operation, laid a number of floors decking board, and pouring concrete slab.
Sliding Door Prefabricated Steel Two Car Garage Metal Building 14
Steel Structure
Sliding Door Prefabricated Steel Two Car Garage Metal Building 15
Shandong Juhe Steel Co. LTD
Was founded in 2013. After more than 10 years of steady development, It has now become a high-tech, diversified, export-oriented international private enterprise integrating research and development, design, production, installation and construction and service. manufacture enterprises in China, also has waterproof anti-corrosion insulation engineering, construction curtain wall engineering, building engineering construction general contracting qualification, be included in the construction industry modernization production base in Shandong province. The core competitiveness of the company comes from the unremitting pursuit of technological breakthroughs. Now, there are more than 100 senior technical personnel of various kinds, and many universities and scientific research institutions to establish cooperative relations. With the help of internal and external intellectual resources, relying on steel structure, we continue to innovate in various aspects and achieve new breakthroughs.
Sliding Door Prefabricated Steel Two Car Garage Metal Building 16
Sliding Door Prefabricated Steel Two Car Garage Metal Building 17
Sliding Door Prefabricated Steel Two Car Garage Metal Building 18
Sliding Door Prefabricated Steel Two Car Garage Metal Building 19
Sliding Door Prefabricated Steel Two Car Garage Metal Building 20

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
 
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
FAQ

 

Portable Garage For Two Car Parking Prefabricated Steel Garage Buildings High Quality Portable Light For Car
Q1: How long does it take to get my building?
A: Lead time is vary, but typically 2 weeks of drawings and 6-8 weeks for delivery(depending on complexity)

Q2: What are the benefits of steel construction?
A: 1-Durable and with long lifespan.
2-Short construction period than concrete and wooden building.
3-Low cost and reusable.
4-High strength and light weight, has good seismic performance.
5-Widely used for multi-purpose buildings.

Q3: Why choose JU HE?
A: At JU HE, the customer is the first priority. We don't pull any gimmicks. We are veteran owned and
operated business, unmatched in customer service. We have more than 10 years of metal building experience. We are also very reputable manufacture and can answer your questions regarding any tape of construction project.We care about your needs and value your business.

Q4: How can l get the quotation of the project?
A: lf you have the drawing, we can offer you our quotation accordingly. lf youhave no design, our engineer will design for you to confirm. And then offer you a quotation.

Q5: Do you offer designing service for us?
A: Yes, we can provide full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (X steel) and etc. We can design complex industrial building like office building,
supermarket, auto dealer shop, shipping mall, hotel etc.

Q6: Do you provide samples?
A: Yes, we could offer the sample for free but do not pay for the cost of transportation.

Q7: What is your terms of payment ?
A: L/C, T/T, and Western Union.

Q8: How about your quality control?
A: We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.

Q9: Can you provide the installation help?
A: We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation. However, the visa fee, air tickets,accommodation, wages will be provided by buyers.

Dear Customer

If you have drawings, welcome to share drawings with us, quotation will be done based your drawings. Our excellent design team will design the steel structure workshop warehouse for you. If you give the following information, we will give you an satisfactory drawing.
1 Location (where will be built? ) which country? which city?
2 Size: Length*width* Eave height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height) _____kn/m2, _____mm, temperature range?
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high? or other?
7 thermal insulation If yes, EPS,fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quantity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max.Lifting height _____m
Recommended Products
Get in touch with us
Tel : 13326252166
Fax : 86-133-2625-2166
Characters Remaining(20/3000)